|
Product Detail :
|
The project involves the installation of electrical infrastructure, including the installation of a 63 KVA transformer, new 11KV AB switches for various feeders, and the shifting of an 11KV line. The work is aimed at enhancing the electrical distribution network in the specified areas. 63 KVA transformer, 11KV AB switches
|
| Tender Detail : |
The project involves the installation of electrical infrastructure, including the installation of a 63 KVA transformer, new 11KV AB switches for various feeders, and the shifting of an 11KV line. The work is aimed at enhancing the electrical distribution network in the specified areas. |