|
Product Detail :
|
OHE - PACKAGE -1C DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING
OF 2x25 KV, 50 Hz, TRACTION OVER HEAD EQUIPMENT AND OTHER ASSOCIATED
WORKS BETWEEN SECTION PIPALIYA NANKER (129.000 KM) (INCL.) - BUDHNI
(198.000 KM) 69 RKM / 81 TKM IN CONNECTION WITH NEW B.G. RAILWAY LINE
BETWEEN MANGALIYAGAON (INDORE) - BUDNI ON RATLAM DIVISION OF WESTERN
RAILWAY AND BHOPAL DIVISION OF WEST CENTRAL RAILWAY IN THE STATE OF
MADHYA PRADESH, INDIA
|
| Tender Detail : |
OHE - PACKAGE -1C: DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING
OF 2x25 KV, 50 Hz, TRACTION OVER HEAD EQUIPMENT AND OTHER ASSOCIATED
WORKS BETWEEN SECTION PIPALIYA NANKER (129.000 KM) (INCL.) - BUDHNI
(198.000 KM) 69 RKM / 81 TKM IN CONNECTION WITH NEW B.G. RAILWAY LINE
BETWEEN MANGALIYAGAON (INDORE) - BUDNI ON RATLAM DIVISION OF WESTERN
RAILWAY AND BHOPAL DIVISION OF WEST CENTRAL RAILWAY IN THE STATE OF
MADHYA PRADESH, INDIA |