|
Product Detail :
|
Knifing Stopper (Air Drying quality) to IS5083/2023 (Third Revision) &
Spec.ICF/MD/Spec.045 issue status-02,Rev-03. Packing in 20 Kgs. new non-
returnable M.S. Drums to IS2552/89 Gr. B-II. The date of supply of the material
should be within 60 days from the date of manufacture. . * Knifing Stopper (Air Drying quality) to IS5083/2023 (Third Revision) & Spec.ICF/MD/Spec.
045 issue status-02,Rev-03. Packing in 20 Kgs. new non-returnable M.S. Drums to IS2552/89 Gr. B-II. T
he date of supply of the material should be within 60 days from the date of manufacture. [ Warranty P
eriod 30 Months after the date of delivery ]
[Quantity Tolerance (+/-) 5 %age , Item Category Normal , Total PO value variation
Permitted Max 8 lacs ] ]
|
| Tender Detail : |
Knifing Stopper (Air Drying quality) to IS:5083/2023 (Third Revision) &
Spec.ICF/MD/Spec.045 issue status-02,Rev-03. Packing in 20 Kgs. new non-
returnable M.S. Drums to IS:2552/89 Gr. B-II. The date of supply of the material
should be within 60 days from the date of manufacture. |